Case Study – 7
Step by step images showing Mr & Mrs Carroll’s 8m x 3m twin skin cabin with Metal roof being installed, May 2010.

If you cannot find the design or size you are looking for, we can design and install your very own unique, bespoke cabin.

BASEWORK IS CONSTRUCTED FOR 8MX3M TWINSKIN CABIN

PLASTIC RECYCLED POSTS ARE POST FIXED IN TO POSITION TO SUPPORT THE STRUCTRAL FRAME

6MM EXTERNAL PLY IS FITTED BEFORE THE FLOOR BEARERS ARE FIXED TO STRUCTRAL FRAME

THE CABIN CONSTRUCTION IS UNDERWAY

THE TWINSKIN WALL GIVES YOU THE OPTION OF INSULATING THE WALLS AS WELL

THE CABIN WALLS HAVE BEEN COMPLETED

INTERNAL VIEW OF CABIN UNDER CONSTRUCTION

SHUTTERS ARE FITTED FOR SECURITY

INTERNAL VIEW OF CABIN

EXTERNAL VIEW OF SHUTTERS

WORK STARTS ON THE METAL ROOFING

FELT AND BATTENS ARE FITTED BEFORE THE METAL ROOFING SYSTEM IS FIXED TO BATTEN

WORK ON METAL ROOF CONTINUES

COMPLETED TILE ROOF

COMPLETED CABIN

CALL ME

BLOCKBUSTER  OFFER
XMAS OFFER
SAVE UP TO
£2,395!!

 
This amazing offer ends
on the 21st Dec
Don't miss out! 

 
FREE
Cabin Construction
OR Free
Heating & Air Conditioning

Contact us for more details or to arrange a visit to one of our 3 display villages in Surrey.

HURRY - OFFER ENDS 21st Dec 2023
close-link