Mr & Mrs Carroll’s 8m x 3m twin skin cabin with Metal roof installed May 2010

Mr & Mrs Carroll's 8m x 3m twin skin cabin with Metal roof installed May 2010

Case study – 7

Step by step images showing Mr & Mrs Carroll’s 8m x 3m twin skin cabin with Metal roof being installed, May 2010.

If you cannot find the design or size you are looking for, we can design and install your very own unique, bespoke cabin.

ALL CABINS
Case Study 7 – Stage 1
Case Study 7 – Stage 2
Case Study 7 – Stage 3
Case Study 7 – Stage 4
  • Basework is constructed for 8mx3m twinskin cabin
  • Plastic recycled posts are post fixed in to position to support the structral frame
  • 6mm external ply is fitted before the floor bearers are fixed to structral frame
  • The cabin construction is underway
  • The twinskin wall gives you the option of insulating the walls as well
  • The cabin walls have been completed
  • The floor insulation is about to be fitted between the floor bearers
  • Internal view of cabin under construction
  • Shutters are fitted for security
  • Internal view of cabin
  • External view of shutters
  • Work starts on the Metal Roofing
  • Felt and battens are fitted before the Metal roofing system is fixed to batten
  • Work on Metal roof continues
  • Completed tile roof
  • Completed Cabin
  • All that remains is for the customer to preserve their cabin in the shade